01 · SILO DIAGNOSTIC

WKS 1–3

02 · LOGIC INLAY

WKS 4–9

03 · SILENT ARCHITECT

WKS 10–11

2026 · ONE PARTNER
010203SILO DIAGNOSTICLOGIC INLAYSILENT ARCHITECT11 WEEKS · THREE PHASES · ONE PERMANENT INLAY

THE 2026 PILOT PROGRAM

Eleven Weeks.
One Network.
Permanent.

A live ACN deployment on your production infrastructure. At handover — source code, documentation, and permanent IP ownership. Bankhosa walks away. The system stays.

11weeks
1partner only
yours to keep

11

Weeks

Structured delivery

Live

Environment

Not a sandbox

1

Partner only

2026 cohort

100%

IP transfer

Permanent ownership

0

Ongoing fees

On delivered system

THE BRIEF

Why this pilot
is different.

This is not a proof of concept.

The ACN is deployed on live production infrastructure. Real traffic. Real fault conditions. Real results. If it does not perform, it gets pulled.

This is not a pilot with strings attached.

There is no renewal. No conversion fee. You receive source code, documentation, and permanent IP ownership. Bankhosa earns nothing beyond the pilot engagement fee.

This is not a vendor relationship.

Bankhosa is not selling you a subscription. We are building something for you, handing it over, and walking away.

CONFIRMED DEPLOYMENT MODEL

The Inlay Architecture is deployed on real ISP/Telco backbone environments. The failure modes described — ghost assets, alert storms, MTTI saturation — are observed realities from those deployments, not theoretical projections.

2hr

Legacy MTTR

3min

Inlay MTTR

5,847

Legacy tickets

1

Inlay incidents

ENGAGEMENT STRUCTURE

Eleven weeks.
Three precise phases.

PHASE

01

Silo Diagnostic

WEEKS 1–3

Before any automation is proposed, we spend three weeks inside your infrastructure. We map every data source, every logging format, every gap between your NetOps, SecOps, and IT Support functions — and assess whether the Refinery SLM can unify them without a consulting engagement. This is not a sales document. It is an engineering document.

DELIVERABLES

Complete data source inventory across all departments and systems
Silo topology map — where information is being lost or fragmented
Security posture review — disconnected SOC tooling and blind spots identified
Refinery SLM fit assessment — what can be unified without professional services
Foundational Overhaul specification and honest ACN fit verdict

PHASE

02

Logic Inlay

WEEKS 4–9

The ACN Control Plane is deployed on a defined sub-section of your production network — not a sandbox, not a simulation. Real infrastructure. Real traffic. Real fault conditions. The Verifier SLM goes live at the network edge — detecting faults and, where applicable, security anomalies from the same model. You watch it work.

DELIVERABLES

Refinery SLM deployed — silos unified, ingestion standardised, zero consulting bill
ACN Control Plane live on production sub-network
Verifier SLM active — fault detection and security anomaly monitoring
LLM Reasoner + Governor live — autonomous action with full audit trail
Daily briefing logs — every decision, every action, human-readable

PHASE

03

Silent Architect

WEEKS 10–11

A Tier-5 engineer operates as a Silent Architect throughout — monitoring every autonomous decision, available within one hour for any concern. At handover you receive complete source code, full documentation, and permanent IP ownership.

DELIVERABLES

24/7 Tier-5 engineering oversight for full pilot duration
Complete source code — clean, documented, yours
Full IP transfer on handover — permanent ownership
Operational handbook — how to manage and extend the ACN
Expansion specification — how to scale to full network coverage

AT HANDOVER

What you leave with.
Permanently.

Full Source Code

Complete ACN codebase — clean, documented, version-controlled
All ingestion agents, logic engine, state manager
Deployment scripts and infrastructure configuration

Permanent IP Ownership

Zero licensing fees — ever
No usage-based billing
No subscription that scales against your growth
Freedom to extend, modify, or white-label

Operational Continuity

Operational handbook — how to manage and extend
Expansion specification — scaling to full network
30-day post-handover support window
Option to engage Bankhosa for future extensions

IDEAL PARTNER PROFILE

Is this you?

The 2026 Pilot is not a fit for every organisation. We would rather say no now than fail in production.

Infrastructure type
Large SA telco, ISP, subsea cable, fibre network — or financial institution with legacy core architecture
Current tooling
Running AIOps, NOC tooling, or legacy core maintenance that is not delivering on its promise
Data situation
Multiple siloed systems — NetOps, SecOps, and IT Support operating independently, or fragmented banking cores
Security posture
No unified threat detection layer — SOC tooling disconnected from network operations context
Decision authority
CTO or CIO engagement — someone who can approve architectural change without a committee approval chain
Timeline
Prepared to begin Q1 or Q2 2026
Mindset
Tired of hype. Ready for an honest engineering conversation — no pitch, no sales deck.
APPLICATIONS OPEN · 2026

If this is you —
let's talk.

No sales deck. No pitch. A direct conversation about your infrastructure and whether the ACN is the right response.

WHAT HAPPENS NEXT

01You send a message via the contact form.
02Bheki responds within 4 hours. Personally.
03One call — 30 to 45 minutes. No pitch.
04Honest assessment. Yes or no, 48 hours.
05If aligned — pilot scope in 5 business days.
BANKHOSA (PTY) LTD · SANDTON · 2026 PILOTPEOPLE ARE KINGS · LOGIC IS ABSOLUTE